
Threads
Workshops
Join 762 other subscribers
ive spent ages trying to think of a cool post name here but i cant too worn out from stuffing about with the AE86.
Now with just under 4 weeks to go till the Mallala Matsuri we still seem to be on track which is a good thing.
This week the main focus has been to get the exhaust done and i cant thank Timmy D enough here he has really done an excellent job in building me a custom Stainless steel exhaust thats all tig welded and really close to the body to prevent the damage that the old exhaust saw.
As you can clearly see we use only the finest adjustment tools and working conditions.
Timmy really has the skills to pay the bills
if your interested in getting something made like this for your car dont hesitate to contact us.

Precision cutting device consisting of a “G” clamp and angle grinder, who needs a drop saw!
(Lips Approves!)

The Front section of the system awaiting final welding
We had hoped to get more done but theres been a few shenanigans
Although thats half the fun.
Sorry for the lack of updates but ive been stuck playing computer games, being cold and CBF syndrome!
After having the go ahead from quality control on the manual steering conversion, Rowdy gave us the go ahead to start the fitting of the 7AGE
Josh with his epic beard had the gearbox all cleaned down with RP7 of all things. A whole seasons worth of grime right thur!
At this point in the evening we had managed to get 7 people around to help which we needed as the extra height of the 7afe block made it hard to negotiate the install.
Pictured here you can see the GREX oil re-location kit and the custom battery mount ( hunk of drift wood lol )
Motor and gearbox in, extractors and radiator in. still needs an exhaust wiring tunning and some other things but its all achievable in the 4 week time frame that we have 🙂